School Improvements Photo Gallery
School Improvements Photo Gallery
School Improvements Photo Gallery
Summer Projects and Improvements around St Thomas More Campus.
Click HERE for a photo gallery.
As you return from the summer you will come across some of the projects and improvements we have been working on in the church and the school since June, aside from the major construction work that is so visible throughout campus. Following is a list of most of them, with acknowledgement to those who gave from their Time, their Talent and their Treasure to make these projects a reality:
Church Projects:
- Rejuvenation of Baptismal font (Contractor).
- Deck renovation in Youth House (In house, Les Mazur, Krys Bielen)
- Major renovations in Caring and Sharing Center (In house, Les Mazur, Krys Bielen)
- Reconfiguration and additional shelving space in basement (In house, Les Mazur, Krys Bielen)
School
- Interior painting and touch up (Don Prost)
- PreK playground equipment relocation (Vincent Soden)
- Lower School HVAC Replacement (Contractor).
- Lower School ceiling fan replacement (In house, Les Mazur, Krysz Bielen)
- Lower School Water Fountain replacement (in house, Les Mazur, Krysz Bielen)
- Lower School light upgrades (Dan Schaefer, Gregg Davis, Carlos Lima)
- Carpet Replacement in KA and KB (Contractor)
- Installation of split A/C unit in Lower School kitchen (In house, Les Mazur, Krys Bielen)
- Renovations in Lower School Teacher’s Lounge (Keith Silva, Jerry Kyle, Les Mazur, Krysz Bielen)
- Lower School Office reconfiguration (Nick Landi, Jerry Kyle)
Last Published: August 27, 2009 11:17 AM